County comparison table
"Repair without a permit" is the county's own published threshold; where a county publishes none, the state rule applies (permit required unless the building official approves). "Design wind speed" is the Risk Category II ultimate design wind speed for a typical home as published by the county; Florida does not publish an official one-number-per-county table (floridabuilding.org wind maps notice), so a county that publishes no current value shows "Not published by county." No county on this page is in the High-Velocity Hurricane Zone, which covers only Broward and Miami-Dade (FBC Building 202).
| County | Permit issuer (unincorporated area) | Permit needed for | Design wind speed | HVHZ? | Official link |
|---|---|---|---|---|---|
| Lake | Lake County Office of Building Services; Clermont and other cities run their own | Re-roofs; shingle repairs over 100 sq ft | Not published by county | No | Building Services |
| Orange | Orange County Division of Building Safety; Orlando, Winter Park, Apopka run their own | Re-roofs and roof repairs (tarps excluded) | Not published by county | No | Fast Track |
| Osceola | Osceola County Building & Permitting; Kissimmee and St. Cloud run their own | Re-roofs; repairs over 100 sq ft | Not published by county | No | Permits portal |
| Seminole | Seminole County Building Division; Sanford, Oviedo and others run their own | Re-roofs; repairs over 300 sq ft | Not published by county | No | Building Division |
| Volusia | Volusia County Building and Code Administration; Orange City, DeLand, Deltona and others run their own | Re-roofs; repairs unless the building official approves | Not published by county | No | Permit Center |
| Flagler | Flagler County Building Department; Palm Coast, Flagler Beach, Bunnell run their own | Re-roofs; repair threshold not published | 130 mph line; coastal debris region | No | Building & Inspections |
| Brevard | Brevard County Building Permits; Melbourne, Palm Bay, Titusville and others run their own | Re-roofs; shingle repairs over 100 sq ft (storm guide) | Not published by county | No | Residential re-roof |
| Polk | Polk County Building Division; Lakeland, Winter Haven, Lake Wales, Haines City run their own | Re-roofs; repairs of 25% or more (building official decides) | Not published by county | No | Permitting |
| Sumter | Sumter County Building Services (also all five cities) | Re-roofs; repairs of 100 sq ft or more | 135 mph (county FAQ) | No | Re-roof page |
| Marion | Marion County Building Safety; Ocala runs its own | Re-roofs; repairs over 100 sq ft | Not published by county | No | Building Safety |
| Citrus | Citrus County Building Division; Crystal River and Inverness run their own | Re-roofs; minor repairs use a separate permit | Not published by county | No | Building Division |
| Hernando | Hernando County Building Division; Brooksville runs its own | Re-roofs; repairs over 2 squares (200 sq ft) | Not published by county | No | Building |
| Alachua | Alachua County Building Division; Gainesville and City of Alachua run their own | Re-roofs; repairs above the state $7,500 rule or with sheathing | Not published by county | No | Building Division |
| Bay | Bay County Building Safety; Panama City, Panama City Beach, Lynn Haven run their own | Re-roofs; repairs over 100 sq ft | 130–140 mph by area | No | Building Safety |
| Okaloosa | Okaloosa County Building Division; Destin, Fort Walton Beach, Crestview run their own | Re-roofs; shingle repairs over 2 squares, metal over 100 sq ft | Zones under 140, 140+ and 150+ mph | No | Permitting |
| Walton | Walton County Building Division (also DeFuniak Springs and Freeport) | Re-roofs; repair threshold not published | 130–150 mph by area | No | Building Division |
| Gulf | Gulf County Building Department; Port St. Joe runs its own | Re-roofs; repair threshold not published | 140 mph (county code) | No | Building Department |
| Santa Rosa | Santa Rosa County Development Services, countywide (Milton, Gulf Breeze and Jay approve first) | Re-roofs; repairs over 200 sq ft | Not published by county | No | Development Services |
| Escambia | Escambia County Building Services (also Century and Pensacola Beach); Pensacola runs its own | Re-roofs; shingle repairs over 2 squares (county), 100 sq ft or more (Pensacola) | Not published by county | No | Building Services |
| Holmes | Holmes County Building Department (Bonifay) | Re-roofs; repair threshold not published | Not published by county | No | Building, Planning & Zoning |
| Washington | Washington County Building Department (Chipley; also Chipley after city approval) | Re-roofs; repair threshold not published | Not published by county | No | Building Department |
Florida rules that apply in every county
When a permit is required
- State law requires a permit to build or repair a building (s. 553.79(1)(a)). The Florida Building Code has no statewide roofing exemption; minor repairs may skip a permit only if the building official approves (FBC Building 105.2.2).
- A local building department may choose to exempt some single-family work, within a state cap of $5,000 per 12 months for work done by someone other than the owner (FBC Building 102.2.5). That is why repair thresholds differ by county.
- Roofing products must carry a Florida Product Approval or local approval; you can look any product up in the state Product Approval database (s. 553.842, F.S.).
- An owner may pull their own permit for a one- or two-family home they live in and are not selling or leasing, but must sign the application in person and supervise the work (s. 489.103(7), F.S.).
Florida's 25% re-roof rule
- No more than 25% of a roof (or roof section) may be repaired, replaced or recovered in any 12-month period unless the whole roof or section is brought up to the current code (FBC Existing Building 706.1.1; FBC Residential R908.1.1).
- The 2007 exception: if the existing roof was built, repaired or replaced under the 2007 Florida Building Code or any later edition, only the part being repaired has to meet current code, even if it is 25% or more of the roof (s. 553.844(5), F.S., added in 2022). Local governments may not amend this exception.
- In practice: a roof installed in 2008 or later usually qualifies for the exception; an older roof that needs a repair covering 25% or more of its area usually has to be replaced in full. Your building department makes the final call. More detail: Florida's 25% roof rule after SB 4-D.
Re-roofing an older home: deck nailing, secondary water barrier and roof-to-wall connections
These "mitigation" rules apply to homes not originally permitted under the Florida Building Code, meaning older homes (FBC Existing Building 706.7 and 706.8, exceptions). The first statewide Florida Building Code is commonly dated March 1, 2002 (being confirmed).
- Roof deck re-nailing: when the roof covering on a wood deck is removed and replaced, plywood or OSB decking held by staples or 6d nails must get supplemental ring-shank nails at 6 inches on center; decking already nailed with 8d nails at 6 inches or closer needs nothing added (FBC-EB 706.7.1, Table 706.7.1.2).
- Secondary water barrier: when the roof covering is removed and replaced, a secondary water barrier must be installed, for example a self-adhering underlayment over the entire deck, or taped deck seams under the underlayment (FBC-EB 706.7.2; methods in FBC Residential R905.1.1.1). Tile roofs installed to code and continuous low-slope roofs are deemed to comply.
- Roof-to-wall connections (straps or clips): required on a re-roof only when the home is in the wind-borne debris region and has a value of $300,000 or more as the code defines it, and the added cost is capped at 15% of the re-roof cost. Gable ends or corners are done only if they fit within that 15% (FBC-EB 706.8; s. 553.844(3)(b)).
- Homes permitted under the Florida Building Code skip these mitigation steps, but a replacement roof must still meet current underlayment and installation rules (FBC-EB 706.1).
- For what changes on December 31, 2026, see the 2026 Florida Building Code and your roof.
- Many counties ask the roofer to sign a notarized affidavit confirming the deck nailing and water barrier work; the county sections below link each form.
After a declared hurricane
- Local governments in an impacted area must expedite permits that need no technical review, including roof repairs and re-roofs, and may waive fees (s. 553.7922, F.S.).
- Each county and city must keep a post-storm permitting plan and publish a recovery permitting guide by May 1 each year, and may not raise building permit fees for 180 days after a declaration (s. 252.381, F.S.).
- Permits and inspections are still required after a storm. DBPR's Hurricane Isaias emergency orders changed who may do roofing work, not whether a permit is needed: "Local permit and inspection ordinances still apply" (DBPR emergency page).
How Florida's wind code affects your new roof
Design wind speed. Florida's code sets the "ultimate design wind speed" every roof must be built to resist, from the wind maps in the code (FBC Building 1609.3, Figure 1609.3(1)). The 8th Edition uses the ASCE 7-22 wind standard. The Florida Building Commission says peninsula wind speeds did not change under it; only the western Panhandle went up (Commission ASCE 7-22 fact sheet). A higher number means stronger fastening: more nails per shingle, closer fastener spacing, and tougher edge and ridge details.
Wind-borne debris region. Your home is in the wind-borne debris region if the design wind speed is 140 mph or more, or 130 mph or more within 1 mile of the coast where open water faces the home (FBC Building 202). Several Panhandle counties map large areas inside it (see Bay, Okaloosa and Walton below); for most Central Florida counties the boundary is not published, so ask your building department. This matters for a re-roof because it is one of the triggers for the roof-to-wall connection rule above.
HVHZ. The High-Velocity Hurricane Zone, with Florida's strictest roofing rules and Miami-Dade product approvals, is only Broward and Miami-Dade counties (FBC Building 202). None of the 21 counties on this page are in it.
What it means for you. Your roofer must use products approved for your wind speed, install them per that approval, and pass the county's inspections. Ask to see the Florida Product Approval numbers on your permit, and keep the permit card and final inspection record with your home papers.
Central Florida counties
Lake County
- Who issues it: Lake County Office of Building Services issues permits for unincorporated Lake County; check your parcel's jurisdiction on the Property Appraiser record. The City of Clermont runs its own building department and issues re-roof permits over the counter with a notarized re-roof affidavit and photos (Lake County; Clermont roof permits).
- When needed: Re-roofs need a permit. The county's post-storm guide lists replacing 100 sq ft (one square) or less of shingles as not needing one (Lake County post-storm guide; BF60 roofing guidelines).
- Fee: $0.03 per square foot of total roof area under the county's FY2027 schedule (Lake County fee schedules 2027). Clermont's schedule dated December 23, 2024 lists $0.06 per sq ft with a $78 minimum (being confirmed with the county).
- Inspections: Dry-in, roof coverings and flashing (Lake County Code, Ch. 6). The BF61 re-roof affidavit, measured photos and product approvals must be on site at the final (BF61 affidavit).
- Portal: Lake County online permits; online residential re-roofs are issued automatically.
Orange County
- Who issues it: Orange County Division of Building Safety for unincorporated Orange County, through Fast Track. Orlando, Winter Park and Apopka run their own building departments (partial list) (Orange County; Apopka).
- When needed: Roof repairs and replacements need a permit; temporary tarps do not (Orange County: Do I need a permit?).
- Fee: $27 for the first $1,000 of job value plus $5 per additional $1,000, in the county Fee Directory effective October 1, 2026 (Orange County Fee Directory). City of Orlando: $66.24 for the first $1,000 plus $4.41 per additional $1,000, plus state surcharges (Orlando 2026 residential fees).
- Inspections: In-progress and final for re-roofs (final only for roof-overs); the county does not accept photos in place of inspections (Orange County: Do I need a permit?). Orlando requires a dry-in and a final, plus a deck-nailing and secondary water barrier affidavit, and offers virtual inspections.
- Forms: Re-Roof Dry-in Inspection Affidavit and Re-Roof Mitigation Requirements. Portal: Fast Track.
Osceola County
- Who issues it: Osceola County Building & Permitting Office; Kissimmee and St. Cloud issue their own permits (Osceola County).
- When needed: "Roofing repairs over 100 sq. ft. require a permit," and repairs over 25% of the roof require full replacement (Osceola roofing requirements).
- Fee: $80 for a re-roof with no plan review fee ($150 when solar is involved), plus a 2.5% state surcharge and 3% technology fee (Appendix A, effective October 2, 2026).
- Inspections: Roof In Progress (1380), Roof Sheathing (1385), Dry-in/Flashing (1390) and Roof Final (1400); video inspections are offered (Osceola inspections).
- Portal: permits.osceola.org; roofing is a quick permit that needs Florida Product Approval numbers.
Seminole County
- Who issues it: Seminole County Building Division for unincorporated Seminole County; Sanford and Oviedo run their own departments (partial list) (Seminole County; Sanford; Oviedo).
- When needed: "Roof repairs exceeding 300 square feet" typically need a permit (Seminole permitting). Oviedo treats re-roofing as structural, so it does not qualify for the state's under-$7,500 exemption.
- Fee: $175 flat for a residential re-roof under interim Resolution 2026-R-61 (Seminole fee schedule, Oct. 2026).
- Inspections: An in-progress inspection with no more than 35% of finish materials installed, then a final with a notarized nail-off affidavit and in-progress photos on site (Seminole re-roof inspection process; re-roof affidavit).
- Portal: Seminole County OneStop.
Volusia County
- Who issues it: Volusia County Building and Code Administration (Permit Center, DeLand) for unincorporated areas. Cities with their own departments include Orange City, DeLand, Deltona, Port Orange, New Smyrna Beach, Daytona Beach and Ormond Beach (partial list) (Volusia Permit Center; DeLand).
- When needed: The county publishes no square-foot exemption; minor repairs skip a permit only with building official approval (Volusia Code, Ch. 22). Orange City says re-roofing does not qualify for the state's $7,500 exemption (being confirmed with the county).
- Fee: Roofing minimum $139.42, or by valuation: $60.34 for the first $2,000, then $8.05 per $1,000 up to $40,000 (Volusia fee schedule 2026–2027). DeLand's application fee is $100 for residential.
- Inspections: Sheathing and underlayment (in-progress) and final; a notarized deck-nailing, underlayment and flashing affidavit is accepted only if an in-progress inspection was scheduled the prior working day (Volusia affidavit). Orange City requires an in-progress inspection after tear-off and dry-in.
- Portal: Connect Live.
Flagler County
- Who issues it: Flagler County Building Department through Central Permitting in Bunnell for unincorporated areas; Palm Coast, Flagler Beach and Bunnell run their own (Flagler County; Bunnell roof permit packet).
- When needed: Re-roofs need a permit (Flagler re-roof requirements). The county publishes no repair threshold (being confirmed with the county); the City of Bunnell treats 100 sq ft or less as maintenance.
- Fee: "Roofing $75 minimum + Valuation" ($25 base plus $3 per $1,000) (Flagler fee schedule) (being confirmed with the county).
- Inspections: The county roofing affidavit does not replace the required in-progress/dry-in inspections; missing them can mean removing the work (Flagler roofing affidavit).
- Wind: The county's map shows a 130 mph Risk Category II line, with the wind-borne debris region running about a mile off the coast and along the Intracoastal, Colbert Lane and John Anderson Highway (Flagler wind speed zones, Jan. 2024).
Brevard County
- Who issues it: Brevard County Building Permits (Viera) for unincorporated areas; Melbourne, Palm Bay, Titusville, Cocoa and Cocoa Beach run their own (partial list) (Brevard building permits; Cocoa Beach).
- When needed: Re-roofs need a permit. The county's storm-recovery guide lists "Roof shingle replacement of 100 square feet or less" as not needing one, excluding underlayment and sheathing (Brevard storm recovery permitting guide) (being confirmed with the county).
- Fee: $25 application fee, $10 enforcement fee and $75 for the first $1,000 of job value plus $3.25 per $1,000 after, plus state surcharges (Brevard residential re-roof) (being confirmed with the county).
- Inspections: Roof Dry In and Roof Final (Residential), which can be done virtually; a recorded Notice of Commencement is required before any inspection (Brevard virtual inspections).
- Portal: BASS online permitting; residential re-roofs are expedited.
Polk County
- Who issues it: Polk County Building Division (Bartow) for unincorporated areas; Lakeland, Winter Haven, Lake Wales and Haines City run their own (partial list) (Polk County Building; Winter Haven; Haines City).
- When needed: The county exempts "Minor roof repairs – less than 25 percent as determined by the Building Official" (Polk permitting). Lakeland exempts only shingle repairs under 25 sq ft (being confirmed with the county).
- Fee: "Residential re-roof $85.00 minimum," then a valuation table (Polk fee resolution 17-025). Without a signed contract, the county assigns a minimum valuation of $170 per square for shingles.
- Inspections: Roof Dry-In Flash In Progress (4501) and Roof Final (4597). The in-progress inspection must be booked for the day the work is done; missing it brings a red tag and fine (Polk inspections). A notarized Roof Affidavit (PD BLD 52) must be on site at final (Roof Affidavit).
- Portal: Polk County Accela.
Sumter County
- Who issues it: Sumter County Building Services issues permits for the unincorporated county and, since April 1, 2025, all five cities (Sumter Building Services). Homes in The Villages may be permitted by Sumter, Lake or Marion County, Lady Lake, Leesburg or Fruitland Park depending on location (Villages district FAQ); Sumter's re-roof page notes Villages architectural review may also be needed.
- When needed: "Roof – Repair existing roof covering less than 100 square feet" needs no permit (When is a building permit required?).
- Fee: $121 for a shingle re-roof, $181 for metal, tile or concrete, plus a $24 processing fee and state surcharges (Sumter permitting fees, effective Oct. 1, 2024).
- Inspections: A notarized Roofing Inspection Affidavit (deck nailing and secondary water barrier) must be uploaded before the final (Sumter roofing affidavit).
- Wind: The county FAQ gives "135 MPH" as its design wind speed, without naming a risk category (Sumter Building Services FAQ). Portal: Citizenserve.
Marion County
- Who issues it: Marion County Building Safety (Ocala) for unincorporated areas; the City of Ocala runs its own permitting and re-roof inspections (Marion Building Safety; Ocala inspections). Belleview and Dunnellon (being confirmed with the county).
- When needed: "Roofing repair 100 square feet or less" needs no permit (Marion permitting FAQs).
- Fee: $125 plus $20 per unit under Resolution 25-R-295, effective October 1, 2025 (Marion fee resolution).
- Inspections: Three separate roofing inspections (codes 151, 152 and 153) and a Roof Deck Inspection affidavit that a homeowner cannot sign (Marion permit inspections).
- Portal: Civic Access (being confirmed with the county).
Citrus County
- Who issues it: Citrus County Building Division (Lecanto) for unincorporated areas; Crystal River and Inverness run their own (Citrus Building Division).
- When needed: Re-roofs need a permit; the fee schedule lists a separate "Minor Roof Repair" permit, and no square-foot exemption is published (being confirmed with the county) (Citrus fee schedule, June 2025).
- Fee: $100 for a residential re-roof plus a $50 application fee credited at issuance; minor roof repair $50 (same schedule).
- Inspections: In-progress (sheathing nailing, underlayment, drip edge, with up to 30% of shingles on) and final. Contractors can pass both with portal photos and a notarized affidavit; owner-builders get in-person inspections (Citrus re-roofing affidavit and requirements).
- Portal: Citrus County Accela.
Hernando County
- Who issues it: Hernando County Building Division (Brooksville) for unincorporated areas; the City of Brooksville runs its own (Hernando Building; Brooksville).
- When needed: As of August 2026, "Minor Roof Repairs (2 squares/200 sq. ft. or less)" are exempt if nonstructural and not in a flood zone; holes in the roof or tree damage still need a permit, and re-roofs always do (Hernando exemption list, updated Sept. 28, 2026).
- Fee: $190 under Resolution 2026-037 (effective March 3, 2026), plus a $93 technology fee and other add-ons (Hernando fee resolution).
- Inspections: A notarized Roofing Inspection Affidavit must be filed before the inspection is scheduled, and the final must be requested within 10 days of finishing (Roofing Inspection Affidavit).
- Portal: Hernando Civic Access.
Alachua County
- Who issues it: Alachua County Building Division for unincorporated areas plus Archer, Hawthorne, LaCrosse and Micanopy by agreement; Gainesville and the City of Alachua run their own (Alachua Building Division).
- When needed: Under the re-roof checklist effective October 1, 2026, a full re-roof always needs a permit; repairs under the state's $7,500 rule do not, as long as no sheathing is replaced; replacing more than 25% means replacing the whole roof (Alachua re-roof inspection checklist).
- Fee: $220 flat for "Roof: New Residential" or "Roof: Repair Residential," effective October 1, 2026 (Alachua building fee schedule).
- Inspections: 1000 In Progress (can be virtual) and 9000 Final, where the roof affidavit is checked (same checklist).
- Portal: Alachua Citizenserve.
Florida Panhandle counties
Bay County
- Who issues it: Bay County Building Safety Division (Panama City) for unincorporated parcels; Panama City, Panama City Beach and Lynn Haven run their own (partial list) (Bay Building Safety).
- When needed: A permit is needed for "Any replacement or repair of more than 100 square feet for a residential project" (Bay County permits; Roofing permit packet).
- Fee: $160 for 1–5 squares plus $1.50 per square after that, plus state surcharges (Bay fee schedule effective July 1, 2026).
- Inspections: Sheathing (alone or with dry-in), roofing (dry-in, coverings, flashing), then final; the Notice of Commencement must be posted first (Bay 8th Edition minimum inspections).
- Wind: The county's 8th Edition map shows 130 and 140 mph contours and a wind-borne debris region within one mile of the mean high-water line (Bay wind-borne debris map). Portal: Bay County portal.
Okaloosa County
- Who issues it: Okaloosa County Building Division for unincorporated areas plus Shalimar, Cinco Bayou and Laurel Hill; Destin, Fort Walton Beach and Crestview run their own (partial list) (Okaloosa permitting; Destin roof permit requirements).
- When needed: Shingle roofs need a permit for work on "more than two (2) squares"; metal roofs over 100 sq ft (Okaloosa Policy 2015-03).
- Fee: Re-roofs are valued at cost of construction on the county table, with a $70 base fee (Okaloosa 2026 fees).
- Inspections: The re-roof affidavit with photos of deck nailing and the secondary water barrier is due before the final; a separate inspection is added if roof-to-wall work is done (Okaloosa re-roof form).
- Wind: The county's 2026 map shows three zones (under 140, 140+ and 150+ mph), and the county says the 2023 code moved the 140 mph wind-borne debris line north to include "most of northern Okaloosa County including the City of Crestview" (Okaloosa 2026 wind zone map; 2023 code changes). After Hurricane Isaias, re-roof and repair permits are expedited under the county's Hurricane Recovery Permit Guide.
Walton County
- Who issues it: Walton County Building Division (DeFuniak Springs), which also permits for DeFuniak Springs and Freeport (Walton Building Division; DeFuniak Springs).
- When needed: Re-roofs need a permit; no repair threshold is published (being confirmed with the county) (Walton Re-Roof Q&A).
- Fee: Re-roofs are valued at contract cost on the county table, with a $35 minimum (Resolution 2025-70). Building permit fees were reduced to $0 through September 30, 2026; an extension was proposed in August 2026 (being confirmed with the county).
- Inspections: The re-roof affidavit and Final Installation Affidavit must be on file before the roof final; the final is not scheduled until any roof-to-wall affidavit is in (Walton Re-Roof Q&A; Final Installation Affidavit).
- Wind: The Building Official's landmark lines (April 11, 2023) set Risk Category II speeds of 150 mph along the coast, 140 mph through the middle of the county and 130 mph at the northeast edge (Walton wind speed and debris maps). Portal: Walton Civic Access.
Gulf County
- Who issues it: Gulf County Building Department (Port St. Joe) for unincorporated areas and Wewahitchka; the City of Port St. Joe runs its own (Gulf Building Department; Port St. Joe).
- When needed: Re-roofs need a permit; no repair threshold is published (being confirmed with the county).
- Fee: "Residential shingle roof permit fee: $75.00. Residential metal roof permit fee: $100.00." Work started without a permit pays double (Gulf County Code, Ch. 10) (being confirmed with the county).
- Inspections: Requests need 24 hours' notice; a re-roof inspection sequence is not published (being confirmed with the county) (Gulf permit checklist).
- Wind: County code designates the whole county "a 140 mph" wind zone or per the latest code map (same Chapter 10). Portal: Gulf Citizenserve.
Santa Rosa County
- Who issues it: Santa Rosa County Development Services issues building permits countywide; in Milton, Gulf Breeze and Jay the city gives its approval first, then the county issues the permit (Santa Rosa Development Services; Gulf Breeze FAQ).
- When needed: Roof repairs of 200 sq ft or less need no permit under the county's local amendment to the Building Code (Santa Rosa Code Sec. 5-27). A July 2026 county notice says the state's new $7,500 repair exemption does not cover roofing (county notice).
- Fee: "Roofing Permit New or Re-roof" is $67.00 for a single-family home under Resolution 2025-29; which add-on charges apply to a roof permit is not stated (being confirmed with the county) (Santa Rosa fee schedule).
- Inspections: Decking and water barrier (a contractor affidavit can replace it), shingle nailing, and final (Roofing permit application).
- After Hurricane Isaias: the county cites expedited permitting for roof repairs and re-roofs under s. 553.7922 and notes that "A declared state of emergency does not automatically waive building permit requirements" (Santa Rosa 2026 hurricane page). Portal: MGO Connect. Wind: the county's published wind sheet dates from 2012 (current map being confirmed) (Wind speed maps).
Escambia County
- Who issues it: Escambia County Building Services for unincorporated Escambia, the Town of Century, and Pensacola Beach (after Santa Rosa Island Authority approval); the City of Pensacola runs its own department (Escambia Building Services; Pensacola Building Inspections).
- When needed: The county requires a permit for "Re-roofs greater than 2 squares"; shingle repairs of 2 squares (200 sq ft) or less are exempt if sheathing and water barrier need no repair (Escambia permitting). Pensacola exempts roofing repairs under 100 sq ft. A county Building Official bulletin says roofs installed before March 2009 still need full replacement once damage exceeds 25% (Escambia 25% re-roof rule bulletin).
- Fee: The county publishes a fee estimate form rather than a flat re-roof fee (fee estimate form). Pensacola: $40 application fee plus $100 roof permit, plus state surcharges (Pensacola residential fees).
- Inspections: At least two roofing inspections under county code; a notarized county/city roofing affidavit can replace the in-progress inspection (Escambia Code Sec. 14-193; roofing affidavit, 2023 FBC). Pensacola: sheathing and dry-in, then final.
- After Hurricane Isaias: the county waived permit fees for storm-related repairs until further notice and gives priority to roof covering replacement permits (Escambia news release, Oct. 14, 2026; Permitting after a storm). Wind: Pensacola's published wind-line text is marked "DRAFT" (January 2023) (being confirmed with the county) (Pensacola wind speed information).
Holmes County
- Who issues it: Holmes County Building Department (Bonifay) (Holmes Building, Planning & Zoning). Whether the county issues permits inside Bonifay and the other towns is not stated on an official page (being confirmed with the county).
- When needed: Re-roofs need a permit; no repair threshold is published (being confirmed with the county). Florida Product Approval numbers are required for every roofing material (Residential building packet).
- Fee: "$75.00 up to 25 squares, plus $1.00 per square over 25" (Holmes fee schedule). Whether newer plan review fees apply to re-roofs is unclear (being confirmed with the county).
- Inspections: Sheathing nailing, dry-in and final appear on the county's residential checklist, and a nailing and water barrier affidavit asks for photos of each roof plane (same building packet). A re-roof-only inspection list is not published (being confirmed with the county).
- Portal: Holmes permit search (iWorQ).
Washington County
- Who issues it: Washington County Building Department (Chipley); City of Chipley projects get city approval first (Washington County Building; Chipley development guide). Who issues permits in Caryville, Ebro, Vernon and Wausau is not stated officially (being confirmed with the county).
- When needed: Re-roofs need a permit; no repair threshold, re-roof inspection list or roofing forms are published online (being confirmed with the county).
- Fee: "1 to 15sq $100 minimum, each additional square, $1 each," plus a 3% radon surcharge ($4 minimum) (Washington County building fees).
- Wind: County code lists 130 mph south of State Road 20 and 120 mph north, but those values predate the current code maps; confirm the current value with the department (being confirmed with the county) (Washington County Code, Ch. 14).
- Portal: Washington County permits (iWorQ).
